CASE STUDY How One Automotive Manufacturing Leader Saved $1.26M by Preventing RTO Fan Failure

Early detection and guided intervention kept production online, avoided 16 hours of downtime, and ensured compliance.

Unplanned downtime doesn’t just slow production - it can create cascading costs, safety risks, and even compliance issues.

Discover how a high-throughput automotive plant used Waites wireless sensors and analyst insights to catch a degrading RTO fan motor before it failed. By acting early, the team avoided emergency crane lifts, coordinated repairs during a planned shutdown, and saved over $1.26 million in cost avoidance.

What You'll Learn

  • How early detection of bearing degradation prevented failure during peak production.
  • How guided analyst intervention enabled safe, planned replacement instead of costly emergency downtime.
  • How proactive action saved $1.26M and 16 hours of lost production while keeping compliance intact